Projects

MarKit County Landfill

During 2015 Kaul Corporation was instrumental in assisting Wenck Associates Engineers in gaining MPCA regulatory approval for the 1st Engineered Synthetic Turf (ClosureTurf  TM) municipal solid waste landfill closure in the State of Minnesota.

This type of system is gaining momentum with clients who want to reduce future maintenance costs while gaining immediate aesthetic appeal without the need to establish vegetation over a large area with steep side slopes.

Additionally this type of closure is perfectly suited to be combined with PV Solar arrays that can offset the landfill’s  electrical operating costs.

The structured liner and Engineered Synthetic Turf over the approximate 9 acre project was installed by Titan Environmental with sand and Hydrobinder infill services provided by Kaul Corporation.